fbpx

Ground stabilization,

foundations, lifting of foundations, floors and other structures

Stabilization and strengthening of foundation soils
Lifting and leveling foundations and slabs
Filling voids, eliminating voids, reducing the porosity of the base soil
Soil compaction, increasing the strength and deformation characteristics of soils, increasing the waterproofing of the base soils

GEORESIN technology is an innovative solution for construction, reconstruction, repair of buildings and structures of various purposes

Concrete floors of warehouses and production facilities, logistics complexes
Private sector
Runways and roller tracks
Consequences of man-made and natural lowering of the groundwater level
The addition of additional floors above the existing building
Restoration of building foundations after a negative impact in the form of vibration and dynamic loads on the soil layers of the foundation as a result of hostilities
Filling cavities
Subway construction
  • Image 01
  • Image 02
  • Image 03
  • Image 04
  • Image 05
  • Image 06
back-img

WHY WE ARE THE BEST IN OUR BUSINESS

1

The only company in Kazakhstan that carries out work using a formalized geopolymer injection technique, successfully used in the EU and North America.

2

Extended warranty of 5 years. We can guarantee high-quality results not only through our successful cases and reputation. Clients are assured of the long-term effectiveness of our technical solution and are protected by the terms of the contract, which outlines our company's obligations.

3

A comprehensive approach guarantees results. If necessary, we not only stabilize the foundation soils and lift subsided structures, but also inject cracks with special mortars, reinforce, and tighten damaged elements with prestressed spiral reinforcement.

4

The compactness of the equipment and the cleanliness of the process allow for clean, undamaged work on sagging floor slabs and foundations, without damaging interior finishes. The company also handles all waste disposal after the work.

5

The only technology on the Ukrainian market that allows for the lifting and restoration of subsided structures to their original design level with an accuracy of up to 1 mm.

6

Four injection technologies and geopolymers with various characteristics allow for comprehensive solutions to problems of any scale – from cottages to large industrial facilities.

7

No two foundation soil problems are the same. Geological and man-made factors create unique challenges for every building. Therefore, we develop a customized engineering design for all our work, guaranteeing problem resolution and long-term results.

8

Georesin polymers are suitable for working with a wide range of soil types, are optimal for our climate zone, do not pollute water and are resistant to chemical influences.

9

A team of engineers and technicians trained by colleagues in the UK, Germany, the Netherlands, Belgium and Poland.

DEEP STABILIZATION METHOD

Strengthening of buildings and structures foundations base soils.
Eliminate causes of cracks, warping and building tilt.
Guaranteed solution and a visible result.

1

DEEP LIFTING

  • 01
    THE WHOLE COMPLEX OF WORKS: FROM AUDIT AND INSTRUMENTAL INSPECTION TO WORKS AND POST-PROJECT MONITORING.
  • 02
    WITHOUT STOPPING THE FACILITY OPERATION AND BUSINESS PROCESSES.
  • 03
    WITHOUT IMPROVEMENTS AND ADDITIONAL INVESTMENTS.
  • 04
    INSTANT VISIBLE AND INSTRUMENTALLY PROVED RESULT.
  • 05
    CLEANLINESS AND ORDER BEFORE AND AFTER WORK.
  • 06
    EU STANDARD.

SLAB LIFTING METHOD

Packing voids and floors leveling.
Stabilization of floor structures.
Elimination of deformations and their causes.
Unique materials with adaptive properties.

2

FLOOR LIFTING

  • 01
    SURVEY, PREPARATION OF DOCUMENTATION, BUDGETING, TIMING.
    First inspection of the object and consultation of a specialist – free of charge.
  • 02
    DRILLING 8-26 MM HOLES, SETTING OF PACKERS AND INJECTION OF POLYMER MORTAR INTO THE PROBLEM AREA.
    On the local area 1,5 * 1,5 m.
  • 03
    EXPANDING WITH FORCE UP TO 10 MPA, THE POLYMER MORTAR FILLS THE VOIDS, CONNECTS, STRENGTHENS AND STABILIZES THE BASE SOIL.
    Implementation of an average project – from 8 hours to two days of working time.
  • 04
    MEASURING AND RECORDING OF WORKING RESULTS WITH MEASURING EQUIPMENT.
    Accuracy +/- 0.5 mm. Warranty from 5 years.
Stabilization of weak foundation and lifting of floor structures

Stabilization of weak foundation and lifting of floor structures

  • Target:

    Stabilization of the ground and lifting of structures to the design level

  • Location:

    Kazakhstan

  • Technology:

    Deep Lifting & Floor Lifting

  • Year:

    2019

Strengthening the ground with leveling the three-story building with underground parking basement

Strengthening the ground with leveling the three-story building with underground parking basement

  • Target:

    Strengthening the base and correcting the roll

  • Location:

    Kazahstan, Almaty

  • Technology:

    Deep Lifting

  • Year:

    2018

Lifting and re-leveling of the road surface while maintaining the slope after subsidence

Lifting and re-leveling of the road surface while maintaining the slope after subsidence

  • Target:

    The restoration of the sunken area

  • Location:

    Minsk

  • Technology:

    Deep Lifting & Floor Lifting

  • Year:

    2017

Lifting and re-leveling a subsided section at the airport without interfering with the traffic schedule

Lifting and re-leveling a subsided section at the airport without interfering with the traffic schedule

  • Target:

    Re-leveling of the sunken area

  • Location:

    Minsk region, Republic of Belarus

  • Technology:

    Deep Lifting & Floor Lifting

  • Year:

    2016

Үйдегі жарықтар қабырға мәселесі емес болып шықты: GeoResin Қарағандыда іргетас негізін қалай күшейтті

Үйдегі жарықтар қабырға мәселесі емес болып шықты: GeoResin Қарағандыда іргетас негізін қалай күшейтті

  • Target:

    Қабырғаларда жарықшақтардың пайда болуы және дамуы

  • Location:

    Қарағанды

  • Technology:

    Deep Lifting

  • Year:

    2024

Технологиялық учаскедегі инъекциялық жоба: құбырларды демонтаждамай, жер қазу жұмыстарынсыз және технологиялық аймақты тоқтатпай

Технологиялық учаскедегі инъекциялық жоба: құбырларды демонтаждамай, жер қазу жұмыстарынсыз және технологиялық аймақты тоқтатпай

  • Target:

    Қазақстанның Солтүстік Каспий өңірі

  • Location:

    Казахстан, северо-каспийский регион

  • Technology:

    Floor Lifting & Void Filling

  • Year:

    2019


    DO YOU STILL HAVE QUESTIONS?

    Our experts will be happy to consult you. Please fill out this short form so we can contact you.