Elimination of drawdown consequences on JSC " Wimm-bill-Dann»

SOIL STABILIZATION and FLOOR RE-LEVELING
Category
Коммерческие здания
Object
Production site
Focus
Industrial building
Location
Saint Petersburg, Russia
Time of work
2015 г.
The timing
5 days
TECHNOLOGY
DEEP Lifting & Floor LIFTING

JSC "Wimm-bill-Dann" is one of the largest producers of dairy products in Russia.

In September 2015, using GeoResin technology, works were performed to stabilize the soil of the base of the floor slab, as well as fill voids in non-operational communications.

The work was completed within 5 days without stopping production, and all signs of work were eliminated.

After the work was completed, Ground Engineering LLC provided a guarantee to Wimm-bill-Dann for the quality of the work with prolonged conditions.

You can request a call back to discuss the engineering solution and its cost with a specialist.
Back to projects
Standard projects and cost
Completed projects
Leave a comment
Comments
233
  • Services
  • Methods
  • Projects
  • Technoblog
  • Video
  • About us
  • Contacts
  • +7 705 444 56 56
    GeoResin
    Thank you for your comment!
    Close

    Leave your phone number and our consultant will contact you

    How can I call you?
    Your phone:
    Choose a convenient time to call:

    Leave your email and we will send you this article


    Get a free assessment of the construction and installation solution