Lifting and re-leveling a subsided section at the airport without interfering with the traffic schedule
-
Target:
Re-leveling of the sunken area
-
Location:
Minsk region, Republic of Belarus
-
Technology:
Deep Lifting & Floor Lifting
-
Year:
2016