kz
ru
en

We work throughout Kazakhstan

Georesin

Elimination of subsidence of structures and oil tank leaks in the port

Re-leveling of industrial structures
Category
Industrial installations for the storage of liquids
Object
Oil storage tank
Focus
Elimination of structural subsidence while maintaining the slope
Location
Krasnodar region
Time of work
2020 г.
The timing
5 days
TECHNOLOGY
Floor LIFTING

Object:

Port, oil storage tank, volume of 5,000 cubic meters
.
Method:

GeoResin Floor LIFTING.

Problem:

Tank bottom subsidence, S =318.57 m2. The reason for the subsidence is the loosening of the ground due to the presence of swing loads during operation and leakage.

Task:

Strengthening the tank bottom substrate, leveling the steel bottom, eliminating leaks.

Solution: GeoResin:
GeoResin resins were injected under the bottom of the tank, and work was carried out to eliminate the unevenness of the bottom with the creation of a technological slope.

You can request a call back to discuss the engineering solution and its cost with a specialist.
Back to projects
Standard projects and cost
Completed projects
Leave a comment
Comments
333
  • Services
  • Methods
  • Projects
  • Technoblog
  • Video
  • About us
  • Contacts
  • +7 705 444 56 56
    GeoResin
    Thank you for your comment!
    Close

    Leave your phone number and our consultant will contact you

    How can I call you?
    Your phone:
    Choose a convenient time to call:

    Leave your email and we will send you this article


    Get a free assessment of the construction and installation solution