kz
ru
en

We work throughout Kazakhstan

Georesin

Strengthening the eroded base of the column foundation

Object
Production shop
Focus
Foundations of supporting columns
Location
Moscow region
Time of work
2020 г.
The timing
2 days
TECHNOLOGY
DEEP Lifting

Profile:

Capital construction of the "Reconstruction of the bakery products factory»

Method:

GeoResin Deep Lifting.

Problem:

During the construction of a frame-type building, the soil of the base of one of the column foundations with a plan size of 3600*3600mm was washed out. Further loading of the foundation proved to be risky.

Task:

Strengthening of the soil of the base of the foundation of the columns.

Solution:

To solve this problem, a preliminary comprehensive survey of the foundation foundation was carried out. According to the results of the survey, zones of decompressed ground of the base were identified directly at the contact point of the plate-ground and at a depth of up to -2.5 m. The technical solution implied deep strengthening of the soil of the base of the foundation of the columns with the device of a curtain in the erosion zone to prevent horizontal shear phenomena.

You can request a call back to discuss the engineering solution and its cost with a specialist.
Back to projects
Standard projects and cost
Completed projects
Leave a comment
Comments
380
  • Services
  • Methods
  • Projects
  • Technoblog
  • Video
  • About us
  • Contacts
  • +7 705 444 56 56
    GeoResin
    Thank you for your comment!
    Close

    Leave your phone number and our consultant will contact you

    How can I call you?
    Your phone:
    Choose a convenient time to call:

    Leave your email and we will send you this article


    Get a free assessment of the construction and installation solution