Lifting and re-leveling of floor and foundation slabs after uneven subsidence

Food industry
Category
Food warehouses and complexes
Object
Zone of unloading-loading and storage of food products
Focus
Lifting and fixing subsided structures
Location
Sverdlovsk region, Russian Federation
Time of work
2018 г.
The timing
14 days
TECHNOLOGY
DEEP Lifting & Floor LIFTING

Premises:

Warehouse of food and non-food products with an area of 23 thousand square meters.

Problem:

During the construction of the warehouse of food and non-food products, there was an uneven subsidence of the floor slabs and the foundation part of the landing stages.

During the survey, voids up to 15 cm were found under the floor slab, and the recorded deviation of the floor slab from the design mark reached 8 cm. The sediment of the foundation part of the landing stages was up to 9 cm, which led to the suspension of structures on neighboring elements.

Task:

Re-leveling the floor slabs in the horizontal plane, lifting the subsided elements of the foundation of the landing stages.

Decision:

GeoResin specialists performed work on strengthening the base of the floor slab, filling the detected spaces under the slab, leveling the floor slab in a horizontal plane, lifting the foundations of the decks and restoring the working condition of the landing stages.

You can request a call back to discuss the engineering solution and its cost with a specialist.
Back to projects
Standard projects and cost
Completed projects
Leave a comment
Comments
304
  • Services
  • Methods
  • Projects
  • Technoblog
  • Video
  • About us
  • Contacts
  • +7 705 444 56 56
    GeoResin
    Thank you for your comment!
    Close

    Leave your phone number and our consultant will contact you

    How can I call you?
    Your phone:
    Choose a convenient time to call:

    Leave your email and we will send you this article


    Get a free assessment of the construction and installation solution